SR-37 Hamilton Parkway: Difference between revisions

From Indyroads Wiki
Jump to navigation Jump to search
Created page with "Will reconstruct the existing at grade expressway into a grade separated parkway expressway with interchanges. Construction funding is slated for fiscal year 2019 and 2020 whi..."
 
No edit summary
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
Will reconstruct the existing at grade expressway into a grade separated parkway expressway with interchanges. Construction funding is slated for fiscal year 2019 and 2020 which means construction could begin as soon as 2020 but with a project of this magnitude it could be up to 10 phases of construction and several years to complete. Below is a list of the proposed improvements:
Will reconstruct the existing at grade expressway into a grade separated parkway expressway with interchanges. Construction funding is slated for fiscal year 2019 and 2020 which means construction could begin as soon as 2020 but with a project of this magnitude it could be up to 10 phases of construction and several years to complete. The plan is to upgrade SR-37 from a surface expressway to a 4-lane parkway with controlled access interchanges landscaping and parkway features. Below is a list of the proposed improvements:
*Upgrade SR-37 from a surface expressway to a 4 lane parkway with controlled access interchanges landscaping and parkway features.  
 
*126th Street - teardrop roundabout interchange and diagonal on/off ramps
*Phase 1 (2017-2025) - Completed 2025
*131st Street - teardrop roundabout interchange and diagonal on/off ramps/collector Road
**126th Street - teardrop roundabout interchange and diagonal on/off ramps
*135th Street - teardrop roundabout interchange and diagonal on/off ramps/collector Road
**131st Street - teardrop roundabout interchange and diagonal on/off ramps/collector Road
*141st Street - teardrop roundabout interchange and diagonal on/off ramps
**135th Street - right in/right out interchange with diagonal ramps (no bridge crossing or underpass)
*146th Street (Campus Parkway) - teardrop roundabout interchange and diagonal on/off ramps
**141st Street - teardrop roundabout interchange and diagonal on/off ramps
*Greenfield Avenue - teardrop roundabout interchange and diagonal on/off ramps
**146th Street (Campus Parkway) - teardrop roundabout interchange and diagonal on/off ramps
*Town and Country Blvd - teardrop roundabout interchange and diagonal on/off ramps
 
*Pleasant Street - teardrop roundabout interchange and diagonal on/off ramps
*Phase 2 (2027-2032)
*Cherry Street - Right turn only with stop sign to IN-37 south ramp
**Greenfield Avenue - teardrop roundabout interchange and diagonal on/off ramps - Proposed
*Connor Street (SR-32) - teardrop roundabout interchange and diagonal on/off ramps
**Town and Country Blvd/Stoney Creek Rd - hybrid interchange with roundabouts and crossover connection route - Proposed
**Pleasant Street - teardrop roundabout interchange and diagonal on/off ramps - Proposed
**Connor Street (SR-32) - modified hybrid teardrop roundabout interchange and diagonal on/off ramps and slip ramps - Cherry Street ramps will provide connection to and from Connor Street connect - Proposed
 
{| class="wikitable floatright" style="border-spacing: 2px; border: 1px solid darkgray;"
|- border="0" style="text-align: center"
| [[File:SR37Nob.png|700px|Roll Plot]]
|- style="text-align: center"
| SR-37 Noblesville Project Map
|}
===More Information===
*[https://www.hamiltoncounty.in.gov/999/SR-37-Project-Information Hamilton County Highway Department]
*[https://www.in.gov/indot/about-indot/central-office/welcome-to-the-greenfield-district/state-road-37-improvement-project-in-noblesville/ INDOT SR-37 Improvements Page]
*[https://www.in.gov/indot/files/SR-37-Plan-View-Roll-Plot_Jordan-Yaney.pdf Roll Plot PDF - Phase 2 Improvements (INDOT)]
*[https://37thrives.com/ 37 Thrives]
*[https://www.wthr.com/article/news/local/noblesville-state-road-37-construction-improvement-project/531-8cfec7a4-a346-4659-9f7e-2c7b07f87ef1 WTHR13 05/08/2026]
 
 
[[Category:Indiana]][[Category:Projects]]

Latest revision as of 07:17, 2 June 2026

Will reconstruct the existing at grade expressway into a grade separated parkway expressway with interchanges. Construction funding is slated for fiscal year 2019 and 2020 which means construction could begin as soon as 2020 but with a project of this magnitude it could be up to 10 phases of construction and several years to complete. The plan is to upgrade SR-37 from a surface expressway to a 4-lane parkway with controlled access interchanges landscaping and parkway features. Below is a list of the proposed improvements:

  • Phase 1 (2017-2025) - Completed 2025
    • 126th Street - teardrop roundabout interchange and diagonal on/off ramps
    • 131st Street - teardrop roundabout interchange and diagonal on/off ramps/collector Road
    • 135th Street - right in/right out interchange with diagonal ramps (no bridge crossing or underpass)
    • 141st Street - teardrop roundabout interchange and diagonal on/off ramps
    • 146th Street (Campus Parkway) - teardrop roundabout interchange and diagonal on/off ramps
  • Phase 2 (2027-2032)
    • Greenfield Avenue - teardrop roundabout interchange and diagonal on/off ramps - Proposed
    • Town and Country Blvd/Stoney Creek Rd - hybrid interchange with roundabouts and crossover connection route - Proposed
    • Pleasant Street - teardrop roundabout interchange and diagonal on/off ramps - Proposed
    • Connor Street (SR-32) - modified hybrid teardrop roundabout interchange and diagonal on/off ramps and slip ramps - Cherry Street ramps will provide connection to and from Connor Street connect - Proposed
Roll Plot
SR-37 Noblesville Project Map

More Information