SR-37 Hamilton Parkway: Difference between revisions

From Indyroads Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Will reconstruct the existing at grade expressway into a grade separated parkway expressway with interchanges. Construction funding is slated for fiscal year 2019 and 2020 which means construction could begin as soon as 2020 but with a project of this magnitude it could be up to 10 phases of construction and several years to complete. The plan is to upgrade SR-37 from a surface expressway to a 4-lane parkway with controlled access interchanges landscaping and parkway features. Below is a list of the proposed improvements:
Will reconstruct the existing at grade expressway into a grade separated parkway expressway with interchanges. Construction funding is slated for fiscal year 2019 and 2020 which means construction could begin as soon as 2020 but with a project of this magnitude it could be up to 10 phases of construction and several years to complete. The plan is to upgrade SR-37 from a surface expressway to a 4-lane parkway with controlled access interchanges landscaping and parkway features. Below is a list of the proposed improvements:
*Phase 1 (2017-2025)
 
**126th Street - teardrop roundabout interchange and diagonal on/off ramps - Completed 2020
*Phase 1 (2017-2025) - Completed 2025
**131st Street - teardrop roundabout interchange and diagonal on/off ramps/collector Road - Completed 2022
**126th Street - teardrop roundabout interchange and diagonal on/off ramps
**135th Street - right in/right out interchange with diagonal ramps (no bridge crossing or underpass) - Completed
**131st Street - teardrop roundabout interchange and diagonal on/off ramps/collector Road
**141st Street - teardrop roundabout interchange and diagonal on/off ramps - Completed 2025
**135th Street - right in/right out interchange with diagonal ramps (no bridge crossing or underpass)
**146th Street (Campus Parkway) - teardrop roundabout interchange and diagonal on/off ramps - Completed 2023
**141st Street - teardrop roundabout interchange and diagonal on/off ramps
**146th Street (Campus Parkway) - teardrop roundabout interchange and diagonal on/off ramps
 
*Phase 2 (2027-2032)
*Phase 2 (2027-2032)
**Greenfield Avenue - teardrop roundabout interchange and diagonal on/off ramps - Proposed
**Greenfield Avenue - teardrop roundabout interchange and diagonal on/off ramps - Proposed
Line 11: Line 13:
**Pleasant Street - teardrop roundabout interchange and diagonal on/off ramps - Proposed
**Pleasant Street - teardrop roundabout interchange and diagonal on/off ramps - Proposed
**Connor Street (SR-32) - modified hybrid teardrop roundabout interchange and diagonal on/off ramps and slip ramps - Cherry Street ramps will provide connection to and from Connor Street connect - Proposed
**Connor Street (SR-32) - modified hybrid teardrop roundabout interchange and diagonal on/off ramps and slip ramps - Cherry Street ramps will provide connection to and from Connor Street connect - Proposed
{| class="wikitable floatright" style="border-spacing: 2px; border: 1px solid darkgray;"
{| class="wikitable floatright" style="border-spacing: 2px; border: 1px solid darkgray;"
|- border="0" style="text-align: center"
|- border="0" style="text-align: center"
| [[File:SR37Nob.jpg|700px|Roll Plot]]  
| [[File:SR37Nob.png|700px|Roll Plot]]  
|- style="text-align: center"
|- style="text-align: center"
| SR-37 Noblesville Project Map  
| SR-37 Noblesville Project Map  
Line 22: Line 25:
*[https://www.in.gov/indot/files/SR-37-Plan-View-Roll-Plot_Jordan-Yaney.pdf Roll Plot PDF - Phase 2 Improvements (INDOT)]
*[https://www.in.gov/indot/files/SR-37-Plan-View-Roll-Plot_Jordan-Yaney.pdf Roll Plot PDF - Phase 2 Improvements (INDOT)]
*[https://37thrives.com/ 37 Thrives]
*[https://37thrives.com/ 37 Thrives]
*[https://www.wthr.com/article/news/local/noblesville-state-road-37-construction-improvement-project/531-8cfec7a4-a346-4659-9f7e-2c7b07f87ef1 WTHR13 05/08/2026]




[[Category:Indiana]][[Category:Projects]]
[[Category:Indiana]][[Category:Projects]]

Latest revision as of 07:17, 2 June 2026

Will reconstruct the existing at grade expressway into a grade separated parkway expressway with interchanges. Construction funding is slated for fiscal year 2019 and 2020 which means construction could begin as soon as 2020 but with a project of this magnitude it could be up to 10 phases of construction and several years to complete. The plan is to upgrade SR-37 from a surface expressway to a 4-lane parkway with controlled access interchanges landscaping and parkway features. Below is a list of the proposed improvements:

  • Phase 1 (2017-2025) - Completed 2025
    • 126th Street - teardrop roundabout interchange and diagonal on/off ramps
    • 131st Street - teardrop roundabout interchange and diagonal on/off ramps/collector Road
    • 135th Street - right in/right out interchange with diagonal ramps (no bridge crossing or underpass)
    • 141st Street - teardrop roundabout interchange and diagonal on/off ramps
    • 146th Street (Campus Parkway) - teardrop roundabout interchange and diagonal on/off ramps
  • Phase 2 (2027-2032)
    • Greenfield Avenue - teardrop roundabout interchange and diagonal on/off ramps - Proposed
    • Town and Country Blvd/Stoney Creek Rd - hybrid interchange with roundabouts and crossover connection route - Proposed
    • Pleasant Street - teardrop roundabout interchange and diagonal on/off ramps - Proposed
    • Connor Street (SR-32) - modified hybrid teardrop roundabout interchange and diagonal on/off ramps and slip ramps - Cherry Street ramps will provide connection to and from Connor Street connect - Proposed
Roll Plot
SR-37 Noblesville Project Map

More Information