SR-37 Hamilton Parkway: Difference between revisions

From Indyroads Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 11: Line 11:
**Pleasant Street - teardrop roundabout interchange and diagonal on/off ramps - Proposed
**Pleasant Street - teardrop roundabout interchange and diagonal on/off ramps - Proposed
**Connor Street (SR-32) - modified hybrid teardrop roundabout interchange and diagonal on/off ramps and slip ramps - Cherry Street ramps will provide connection to and from Connor Street connect - Proposed
**Connor Street (SR-32) - modified hybrid teardrop roundabout interchange and diagonal on/off ramps and slip ramps - Cherry Street ramps will provide connection to and from Connor Street connect - Proposed
 
{| class="wikitable floatright" style="border-spacing: 2px; border: 1px solid darkgray;"
|- border="0" style="text-align: center"
| [[File:SR37Nob.jpg|700px|Roll Plot]]
|- style="text-align: center"
| SR-37 Noblesville Project Map
|}
===More Information===
===More Information===
*[https://www.hamiltoncounty.in.gov/999/SR-37-Project-Information Hamilton County Highway Department]
*[https://www.hamiltoncounty.in.gov/999/SR-37-Project-Information Hamilton County Highway Department]

Revision as of 07:11, 2 June 2026

Will reconstruct the existing at grade expressway into a grade separated parkway expressway with interchanges. Construction funding is slated for fiscal year 2019 and 2020 which means construction could begin as soon as 2020 but with a project of this magnitude it could be up to 10 phases of construction and several years to complete. The plan is to upgrade SR-37 from a surface expressway to a 4-lane parkway with controlled access interchanges landscaping and parkway features. Below is a list of the proposed improvements:

  • Phase 1 (2017-2025)
    • 126th Street - teardrop roundabout interchange and diagonal on/off ramps - Completed 2020
    • 131st Street - teardrop roundabout interchange and diagonal on/off ramps/collector Road - Completed 2022
    • 135th Street - right in/right out interchange with diagonal ramps (no bridge crossing or underpass) - Completed
    • 141st Street - teardrop roundabout interchange and diagonal on/off ramps - Completed 2025
    • 146th Street (Campus Parkway) - teardrop roundabout interchange and diagonal on/off ramps - Completed 2023
  • Phase 2 (2027-2032)
    • Greenfield Avenue - teardrop roundabout interchange and diagonal on/off ramps - Proposed
    • Town and Country Blvd/Stoney Creek Rd - hybrid interchange with roundabouts and crossover connection route - Proposed
    • Pleasant Street - teardrop roundabout interchange and diagonal on/off ramps - Proposed
    • Connor Street (SR-32) - modified hybrid teardrop roundabout interchange and diagonal on/off ramps and slip ramps - Cherry Street ramps will provide connection to and from Connor Street connect - Proposed
Roll Plot
SR-37 Noblesville Project Map

More Information