SR-37 Hamilton Parkway: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
| Line 22: | Line 22: | ||
*[https://www.in.gov/indot/files/SR-37-Plan-View-Roll-Plot_Jordan-Yaney.pdf Roll Plot PDF - Phase 2 Improvements (INDOT)] | *[https://www.in.gov/indot/files/SR-37-Plan-View-Roll-Plot_Jordan-Yaney.pdf Roll Plot PDF - Phase 2 Improvements (INDOT)] | ||
*[https://37thrives.com/ 37 Thrives] | *[https://37thrives.com/ 37 Thrives] | ||
*[https://www.wthr.com/article/news/local/noblesville-state-road-37-construction-improvement-project/531-8cfec7a4-a346-4659-9f7e-2c7b07f87ef1 WTHR13 05/08/2026] | |||
[[Category:Indiana]][[Category:Projects]] | [[Category:Indiana]][[Category:Projects]] | ||
Revision as of 07:16, 2 June 2026
Will reconstruct the existing at grade expressway into a grade separated parkway expressway with interchanges. Construction funding is slated for fiscal year 2019 and 2020 which means construction could begin as soon as 2020 but with a project of this magnitude it could be up to 10 phases of construction and several years to complete. The plan is to upgrade SR-37 from a surface expressway to a 4-lane parkway with controlled access interchanges landscaping and parkway features. Below is a list of the proposed improvements:
- Phase 1 (2017-2025)
- 126th Street - teardrop roundabout interchange and diagonal on/off ramps - Completed 2020
- 131st Street - teardrop roundabout interchange and diagonal on/off ramps/collector Road - Completed 2022
- 135th Street - right in/right out interchange with diagonal ramps (no bridge crossing or underpass) - Completed
- 141st Street - teardrop roundabout interchange and diagonal on/off ramps - Completed 2025
- 146th Street (Campus Parkway) - teardrop roundabout interchange and diagonal on/off ramps - Completed 2023
- Phase 2 (2027-2032)
- Greenfield Avenue - teardrop roundabout interchange and diagonal on/off ramps - Proposed
- Town and Country Blvd/Stoney Creek Rd - hybrid interchange with roundabouts and crossover connection route - Proposed
- Pleasant Street - teardrop roundabout interchange and diagonal on/off ramps - Proposed
- Connor Street (SR-32) - modified hybrid teardrop roundabout interchange and diagonal on/off ramps and slip ramps - Cherry Street ramps will provide connection to and from Connor Street connect - Proposed
| SR-37 Noblesville Project Map |